City Tools: BIMC (unofficial)

16.20.170 Compliance and enforcement.

A. It is a violation of this chapter for any person to fail to comply with a requirement of this chapter. It is further a violation of this chapter for any person to:

1. Initiate or maintain, or cause to be initiated or maintained, the use, construction, placement, alteration, or demolition of any structure, land, or property within the city without first obtaining permits or authorizations required by this chapter, or in a manner that violates the terms or conditions of such permits or authorizations;

2. Misrepresent any material fact in any application, plans or other information submitted to obtain permits or authorizations under this chapter; or

3. Remove or deface any sign, notice, complaint, or order required by or posted in accordance with this chapter.

B. When a critical area or its buffer has been altered in violation of this chapter, all ongoing development work shall stop, and the critical area shall be restored. The city shall have the authority to issue a stop work order to cease all ongoing development work, and order restoration, rehabilitation, or replacement measures at the owner’s or other responsible party’s expense to compensate for violation of provisions of this chapter.

C. Restoration Plan Required. All development work shall remain stopped until a restoration plan is prepared and approved by the director. Such a plan shall be prepared by a qualified professional using the best available science and shall describe how the actions proposed meet the minimum requirements described in subsection D of this section. The director shall, at the violator’s expense, seek expert advice in determining the adequacy of the plan. Inadequate plans shall be returned to the applicant or violator for revision and resubmittal.

D. Minimum Performance Standards for Restoration.

1. For alterations to frequently flooded areas, wetlands, and habitat conservation areas, the following minimum performance standards shall be met for the restoration of a critical area; provided, that if the violator can demonstrate that greater critical area function or values can be obtained through the application of different standards, these standards may be modified:

a. The historic structural and functional values shall be restored, including water quality and habitat functions;

b. The historic soil types and configuration shall be replicated;

c. The critical area and buffers shall be replanted with native vegetation that replicates the vegetation historically found on the site in species types, sizes, and densities. The historic functions and values should be replicated at the location of the alteration; and

d. Information demonstrating compliance with the requirements in BIMC 16.20.110 shall be submitted to the director.

2. For alterations to flood and geological hazard areas, the following minimum performance standards shall be met for the restoration of a critical area; provided, that if the violator can demonstrate that greater safety can be obtained, these standards may be modified:

a. The hazard shall be reduced to a level equal to, or less than, the predevelopment hazard;

b. Any risk of personal injury resulting from the alteration shall be eliminated or minimized; and

c. The hazard area and buffers shall be replanted with native vegetation sufficient to minimize the hazard.

3. All restoration plans shall include a detailed estimate of the cost for implementation of the restoration plan.

E. Site Investigations. The director is authorized to make site inspections and take such actions as are necessary to enforce this chapter. The director shall present proper credentials and make a reasonable effort to contact any property owner before entering onto private property.

F. Penalties. Any development or activity carried out contrary to the provisions of this chapter shall constitute a public nuisance and may be enjoined as provided by the statutes of the state of Washington. Enforcement of this chapter and the imposition of penalties for violations of this chapter shall be as provided for in Chapter 1.26 BIMC; provided, that in addition to the civil penalties provided for in BIMC 1.26.090, an additional penalty shall be imposed on any person, party, firm, corporation, property owner, or other legal entity who fails to complete a required restoration plan, who conducts any disturbance (including cutting or removing vegetation) of a critical area or its associated buffer in violation of this chapter, or who is otherwise in violation of this chapter, including a violation of BIMC 16.20.090.E. For such violations, the additional penalty shall be in the amount equal to 200 percent of the cost of restoration as approved under a restoration plan pursuant to subsections C and D of this section for a minor violation and a minimum of $2,500 for a major violation. The director shall determine whether the disturbance is a minor or major violation. Any person, party, firm, corporation, or other legal entity who knowingly and willfully refuses to complete a required restoration pursuant to subsections C and D of this section shall be guilty of a misdemeanor punishable by not more than 30 days in jail and/or not more than a $1,000 fine. (Ord. 2018-01 § 2 (Exh. A), 2018)