A. Purpose. The purpose of this section is to establish procedures for administrative decision-making on land use applications. These provisions apply when BIMC does not describe more detailed administrative procedures for a specific type of application, and also supplement those more specific administrative procedures where they exist. If there is an inconsistency between these general administrative provisions and more detailed administrative provisions for a specific type of application elsewhere in the BIMC, the more specific provisions shall govern.
B. Applicability. This section applies generally each time a provision of the BIMC authorizes administrative review of a land use application. Permit-specific review requirements are in relevant subsections. The specific types of applications subject to administrative review are listed in the table in BIMC 2.16.010. When an application requires both an administrative approval under BIMC Title 17 or 18 and also a shoreline jurisdiction approval under Chapter 16.12 BIMC, those approvals may be processed simultaneously.
C. Public Comment. Any person may comment on a proposed application by submitting written comments prior to the end of the notice of the application’s 21-day comment period (except for those applications for which no notice is required under BIMC 2.16.020.M).

D. Decision Procedures.
1. Criteria for Decision. In making the decision, the department director shall consider the applicable decision criteria of this code, all other applicable law, and any necessary documents and approvals. When no other criteria are specified, the director shall apply the following criteria:
a. The application must comply with all applicable requirements of the BIMC as well as state and federal law.
b. The application is consistent with the adopted comprehensive plan, and specifically with the character or intended character of the area in which the property is located, as described in the comprehensive plan.
2. Environmental Review. For a land use application subject to Chapter 43.21C RCW and Chapter 16.04 BIMC, a SEPA threshold determination may be issued simultaneously with the final decision of the land use application.
3. Planning Commission Recommendation. When written public comments are received during the public comment period concerning the effect of the land use application on the comprehensive plan, shoreline master program or matters not addressed by specific provisions of this code, the director may request the planning commission to review an application and make a written recommendation prior to the director making a decision. The planning commission will consider the land use application at a public meeting. The planning commission shall recommend approval, approval with conditions or denial of an application. In making a recommendation, the planning commission shall consider the applicable decision criteria of this code, all other applicable law, and any necessary documents and approvals. If the applicable criteria are not met, the planning commission shall recommend the proposal be modified or denied. A planning commission recommendation is not a final decision and therefore there is no appeal of the recommendation. The planning commission’s written recommendation and other documents upon which its decision is based shall be immediately transmitted to the director and shall be given substantial weight by the director in making a decision.
E. Single Report.
1. The department director shall prepare a single consolidated report setting forth all the recommendations and decisions made on the application as of the date of the report.
2. The report shall state any mitigation required or proposed under the development regulations or as required through SEPA, Chapter 43.21C RCW. The report shall include the SEPA determination if a determination has not previously been issued.
3. If an administrative shoreline master program permit is required for the project pursuant to Chapter 16.12 BIMC, the report shall address the requirements of that chapter.
F. Department Director Decision. The department director may approve, approve with conditions, or deny the application based on the decision criteria, findings of fact, recommendations of the planning commission and design review board as applicable, and any necessary documents and approvals.
G. Corrections or Clarification. The department director may amend the decision at any time to correct clerical errors clearly identifiable from the public record. Such a correction does not affect any time limit provided for in this chapter. The department director may clarify a statement in the written decision at any time as long as the clarification does not materially alter the decision.
H. Effect of Decision. The decision of the department director is the final decision of the city, subject to the appeal provisions in BIMC 2.16.020.R.
I. Revocation of Administrative Approvals. An administrative approval may be revoked by the director upon the finding of any one or more of the following:
1. That the approval was obtained by deception, fraud or other intentional or misleading representation; or
2. That the use for which approval was granted has been changed; or
3. In the case of minor conditional use permits, that the use has at any time been discontinued for a year or more; or
4. That the permit granted is being exercised contrary to the terms or conditions of such approval or in violation of the code; or
5. That the use for which the approval was granted was so exercised as to be detrimental to the public health or safety. (Ord. 2021-03 § 1, 2021; Ord. 2020-03 § 1 (Exh. A), 2020; Ord. 2011-02 § 2 (Exh. A), 2011)