City Tools: BIMC (unofficial)

2.16.125 Long subdivisions review procedures.

A. Purpose. This section provides a procedure for review and approval of preliminary long subdivision applications in compliance with the provisions of RCW Title 58, BIMC Title 17, and other applicable provisions of Washington State law and this municipal code.

B. Applicability. This procedure applies to all applications for preliminary long subdivisions. Long subdivisions involve the division or redivision of land into more than four lots.

C. General Procedures.

1. Long subdivisions shall be approved through the quasi-judicial hearing examiner approval procedures described in BIMC 2.16.100 except as described below.

2. The provisions of this section shall supplement those of BIMC 2.16.020 and 2.16.030 when the application is for a long subdivision. In the event of a conflict between the provisions of BIMC 2.16.020 or 2.16.030 and this section, the provisions of this section shall govern.

3. Vesting. A proposed long subdivision shall be considered under the subdivision ordinance, zoning or other land use control ordinances, and the State Environmental Policy Act in effect at the time a fully completed application for preliminary approval of the subdivision has been submitted to the city. The requirements for a fully completed application shall be defined by the administrative manual.

4. Timeline for Review. The city has 90 calendar days from the filing of a complete application in which to approve, disapprove, or return the application to the applicant for modification. The timeline for review can be extended beyond 90 calendar days if the city determines it has incomplete or insufficient application materials and/or if there are significant changes to application materials. If no action can be taken to approve or disapprove the application within the 90 calendar days, the director must notify the applicant of the reasons for the delay and steps necessary to complete the application.

D. Review Procedures – Proposal Stage. Review of long subdivision proposals shall include all of the following in the order listed:

1. Preapplication Conference. The applicant shall participate in a preapplication conference in accordance with the provisions and requirements in BIMC 2.16.020.I.

2. Public Participation Meeting. As part of the project proposal phase, applicants are required to participate in a community meeting through the city’s public participation program at a planning commission meeting and as outlined in Resolution No. 2021-07. The public participation meeting is a meeting of public engagement, and the applicant’s opportunity to respond to questions, comments, and assessments of the proposed project.

E. Review Procedures – Application Stage. Review of long subdivision applications shall include all of the following:

1. Application. An applicant may submit an application for a long subdivision at any time after completion of the required steps in subsection D of this section or approval of a waiver in accordance with BIMC 2.16.020.I.3 or I.4 or subsection D.1 of this section. The applicant shall submit a complete application with all required submittal requirements listed in the administrative manual.

2. Review by Kitsap Public Health District.

a. Upon receipt of the application and determination of completeness, the director shall transmit a copy of the application to the health district.

b. The health district shall provide written recommendation of approval, approval with conditions, or disapproval of the preliminary long subdivision application pursuant to the decision criteria in subsection F of this section.

3. Review by City Engineer.

a. Upon receipt of the application and determination of completeness, the director shall transmit a copy of the application to the city engineer.

b. The city engineer shall provide written recommendation of approval, approval with conditions, or disapproval of the preliminary long subdivision application pursuant to the decision criteria in subsection F of this section.

4. Review and Recommendation by Planning Commission.

a. The purpose of the planning commission review and recommendation meeting is to review a proposed project for consistency with the comprehensive plan.

b. The planning commission shall consider the application at a public meeting where public comments will be taken. The planning commission shall recommend approval, approval with conditions or denial of an application. In making a recommendation, the planning commission shall consider the applicable decision criteria and all other applicable law. If the applicable criteria are not met, the planning commission shall recommend that the proposal be modified or denied.

c. The planning commission will forward its written findings of facts and conclusions, the planning commission’s determination of the project’s consistency with the comprehensive plan, and the planning commission’s recommendation, including any conditions attached by planning staff. The planning commission’s written findings, conclusions, and recommendation will be included in the staff report transmitted to the director.

d. The planning commission shall review and recommend requests for departures from the applicable subdivision standards for long subdivisions pursuant to the criteria in BIMC 17.12.040.

e. A planning commission recommendation is not a final decision and therefore there is no appeal of the recommendation.

5. Review by Director.

a. The director shall review the application materials, information provided by the health district and city engineer, staff report, and the recommendations of the planning commission and shall prepare a report to the hearing examiner recommending approval, approval with conditions, or disapproval of the application.

b. The planning commission’s recommendation shall hold substantial weight in the consideration of the application by the director. Any deviation from that recommendation shall be documented in the director’s report.

6. Review and Public Hearing with Hearing Examiner.

a. The hearing examiner shall consider the application materials and the director’s recommendation at a public hearing following the procedures of BIMC 2.16.100.C and applicable provisions of BIMC 2.16.020.

b. The hearing examiner shall make compliance with the recommendations of the planning commission a condition of approval, unless the hearing examiner concludes that the recommendations:

i. Reflect inconsistent application of design guidelines or any applicable provisions of this code;

ii Exceed the authority of the design review board or planning commission;

iii. Conflict with SEPA conditions or other regulatory requirements applicable to the project; or

iv. Conflict with requirements of local, state, or federal law.

c. The hearing examiner shall adopt a planning commission recommendation of denial of an application unless the hearing examiner concludes that the recommendation:

i. Reflects inconsistent application of design guidelines, the comprehensive plan, or any applicable provisions of this code;

ii. Exceeds the authority of the design review board or planning commission;

iii. Conflicts with SEPA conditions or other regulatory requirements applicable to the project; or

iv. Conflicts with requirements of local, state, or federal law.

F. Decision Criteria for Preliminary Long Subdivisions. The hearing examiner’s decision shall include written findings of fact that the application meets all the requirements of the following subsections. The preliminary long subdivision may be approved or approved with modification if:

1. The applicable subdivision design guidelines and development standards of BIMC Titles 17 and 18 are satisfied; and

2. The preliminary long subdivision makes appropriate provisions for the public health, safety and general and public use and interest, including those items listed in RCW 58.17.110; and

3. The preliminary long subdivision has been prepared consistent with the requirements of the four-step design process; and

4. Any portion of a long subdivision that contains a critical area, as defined in Chapter 16.20 BIMC, conforms to all requirements of that chapter; and

5. Any portion of a long subdivision within shoreline jurisdiction, as defined in Chapter 16.12 BIMC, conforms to all requirements of that chapter; and

6. The city engineer’s recommendation contains determinations that the following decision criteria are met and such determinations are supported by substantial evidence within the record:

a. The long subdivision meets the requirements of Chapter 17.12 BIMC related to streets and pedestrian access, and water, stormwater, and septic facilities; and

b. The long subdivision conforms to regulations concerning drainage in Chapters 15.19, 15.20 and 15.21 BIMC; and

c. The long subdivision will not cause an undue burden on the drainage basin or water quality and will not unreasonably interfere with the use and enjoyment of properties downstream; and

d. If the long subdivision will rely on public water or sewer services, there is capacity in the water or sewer system (as applicable) to serve the long subdivision, and the applicable service(s) can be made available at the site; and

7. The proposal complies with all applicable provisions of this code; Chapters 36.70A and 58.17 RCW; and all other applicable provisions of state and federal laws and regulations; and

8. The proposal is consistent with the city’s comprehensive plan; and

9. Appropriate provisions for maintenance in perpetuity of natural and/or community space have been made; and

10. The preliminary subdivision design is compatible with the physical characteristics of the proposed subdivision site.

G. Repealed by Ord. 2018-20.

H. Repealed by Ord. 2018-20.

I. Civil Plan Review.

1. The applicant shall submit civil engineering plans and designs to the city for review by city staff and acceptance by the city engineers before submitting an application for final long subdivision approval.

2. No construction on or to the site may take place until civil engineering plans have been received and approved by the city.

3. After the preliminary long subdivision and civil engineering plans have been approved, the subdivider is authorized to develop the subdivision’s facilities and improvements in strict accordance with the standards established by this title, related standards in BIMC Titles 17 and 18, and any conditions imposed.

J. Phased Development of Long Subdivision.

1. Portions of an approved preliminary long subdivision may be processed separately for recording in phases; provided, that (a) the phases were identified in the preliminary long subdivision; and (b) recording of phases is consistent with the conditions of preliminary approval and will meet all the requirements for final approval if subsequent phases are not recorded.

2. Prior to the approval of a phase of a final subdivision, the city engineer or the director may require assurance devices submitted for construction of improvements in subsequent phases if such improvements are necessary for the phases being approved to meet requirements of the subdivision and other applicable ordinances.

K. Modification of Preliminary Long Subdivision.

1. An alteration of an approved preliminary long subdivision that does not change the general plat layout, increase off-site impacts of the subdivision, or modify a provision or condition that was a matter of dispute by any party during the preliminary approval process may be made by the director after notice and opportunity to comment are provided to the applicant and all parties of record. The director shall review and approve or disapprove the request for modification following the process set forth in BIMC 2.16.030.

2. Other modifications to an approved long subdivision must be reviewed in accordance with the process for a new subdivision application and shall be approved consistent with the procedures and requirements of this chapter.

3. The following exemptions shall not constitute changes in the preliminary long subdivision approval and do not require further review as provided for under subsection K.1 or K.2 of this section:

a. Engineering detail, unless the proposed detail modifies or eliminates features specifically required as an element of the preliminary long subdivision approval. For purposes of this section, “engineering detail” shall mean minor changes to proposed road or lot grading or drainage design that do not significantly affect the location of those facilities, and minor changes to locations of utility pipes, swales, or wires that do not significantly affect their visibility from adjacent roads or properties, and similar minor changes;

b. Minor changes in lot lines or lot dimensions; or

c. Minor alterations regarding homesite location and/or open space usage. (Ord. 2025-07 § 10 (Exh. H), 2025; Ord. 2021-03 § 7, 2021; Ord. 2018-20 § 11 (Exh. F), 2018; Ord. 2017-02 § 7, 2017; Ord. 2011-21 § 5, 2011)